Time to glue the floors and more doublers onto the bulkheads. I have 5 of the bulkheads all laid out with the floors glued and clamped.
The picture below is bulkhead #3, which supports the mast and hence has the most extensive hardwood doubler to give it strength. The thicker side pieces give a stronger joint with the hull strip planking allowing it to support more load.