The building frame provides a solid base for the assembly of the bulkheads and longitudinals. The first level is anchored into the concrete floor.
The crossmembers must be positioned carefully at right angles to the centre line and the correct distance apart because they set the position of the bulkheads.
The building frame below is ready for the supports to be added.