Taking Stock

I am making steady progress. Every visit to the shed adds another two planks.

The closer to the keel I get, the more twist the planks have. At the stem, planks are vertical, while at the transom planks are now horizontal. I have shown in photographs below clamps being used to get the right twist in the plank to allow fixing into place.

And now a couple of photographs to show progress.

To take stock, I decided I should put numbers the work to date. Here is my status:

  • 50 strip planks scarfed and fixed in position
  • 558 pilot holes drilled
  • 230 screws inserted
  • 328 grip fast nails hammered in and countersunk
  • 10Kg of resin applied

That made me feel better!